Commercial control for infrastructure and EPC contractors, running on WhatsApp

Bill what you built. Claim what you're owed. Pay for what you received. Velora builds the proof behind every bill, claim and vendor payment from what your site teams already post on WhatsApp. No chasing site.

It matches the work done to your BOQ, collects the test results, checklists and photos your client needs to certify it, chases what your team marks due, and flags hindrances and change of scope against your contract's notice deadlines. No new app for site teams.

See how it works ↓

5% → 20%Retention held on one contractor's bill when supporting documents were missing, their billing head told us.

Take one road package. Every day its sites post hundreds of updates, in every language, across every group.

Velora reads each one: what was done, where, how much, and what proves it.

Each day's work adds up across the month, and is checked against your scope.

Every stretch needs its proof. What's missing is chased before the cut-off.

Then the bill is packaged: every quantity, with the proof behind it.

Not just EOT. Every post is checked against the clauses nobody has top of mind, like the same stretch caving in twice.

Every post ends up where it counts: on the bill, in a claim, or against a payment.

Package 2 · Front 1
Ch 38+000 – 43+000 · Suresh, Velora +8
Suresh
DBM laying completed CH 42+300 to 42+850 LHS
4 photos
5:42 PM
Package 2 · Road Furniture
Vijay, Velora +4
Vijay
Delineators lagaye 46+100 se 46+400 RHS, 18 nos
2 photos
5:50 PM
Package 2 · Front 2
Ch 43+000 – 48+000 · Kamal, Velora +6
Kamal
Subgrade caved in again at 44+950 RHS, refilling with boulders
4 photos
10:15 AM
Package 2 · Store
Ramesh, Velora +3
Ramesh
20 mm aggregate received, 3 tippers, 72 MT, Shiv Stone Crusher
Weighbridge slips, royalty papers
6:20 PM
+3 More Groups
Velora
October · Package 2Updated 7:10 PM
DBM · LHS2,250 m
3 records this month, each with its chainage and photos
Ch 39+200 – 40+000Front 1 · level survey in12 Oct800 m
Ch 40+600 – 41+500Front 1 · level survey in21 Oct900 m
Ch 42+300 – 42+850Front 1 · level survey inToday550 m
BillOn this month's bill
Delineators212 nos
24 posts this month, each with its chainage and photos
BillOn this month's bill
Ground conditions · RHSCh 44+950
Second cave-in here, 12 days after the first · posted today
ClaimEngineer notice tracked · project head alerted
20 mm aggregate72 MT
Shiv Stone Crusher · 3 loads · slips and royalty papers kept
PayIn the deliveries report by vendor
Reports for your team
Bill quantities.xlsxDeliveries by vendor.xlsx
Package 2 · QC
QC Team, Velora +4
Proof for the bill
DBM Ch 42+300 – 42+850 LHS done today. Please share the level survey for this stretch before the bill cut-off.
6:24 PM ✓✓
Arun
Level survey for 42+300 to 42+850
Survey sheet
7:10 PM
Logged against DBM Ch 42+300 – 42+850. Proof complete.
7:10 PM ✓✓
Anita · Commercial Manager
Before the October bill
Bill summary
Ready to bill: DBM 2,250 m and delineators 212 nos, documents complete. Potential extra work: drain extended 40 m on the engineer's instruction, no BOQ item. Measurement not found: kerb repair at Ch 45+100, no length given.
October bill quantities.xlsx
9:00 AM ✓✓
Anita
Ask site for the kerb length.
9:04 AM
Done, asked in the Front 2 group.
9:04 AM ✓✓
Sent on WhatsApp to whoever owns it

What's missing between the site and the balance sheet.

4½ monthsOf NCC's revenue sat as work done but not yet billed: ₹7,174 crore (about US$800 million) built on site that the client can't certify or pay until it's billed and proved (Q2 FY27 earnings call).

And on site, what we've seen:

7WhatsApp groups on one site
150scope items
80checklists a month
3,400pages of contract

Nothing connects them.

Three jobs. Three ways it slips.

Bill

Work done on site has to reach this month’s bill, with the proof to get it certified.

80 checklists to close every month, on each of five sites, and every client wants its billing package in the same last week. The follow-up starts late, and from memory.

On a highway, hundreds of patch repairs, each a photo with a chainage and a size, collated by hand against one BOQ item.

Work is done. Revenue is earned. Cash still waits.

  1. Site work
  2. Proof
  3. Scope check
  4. Bill
5% → 20%Retention held against one contractor when evidence was missing, their billing head told us.
100sOf patch measurements in a few weeks, on one contract.
Claim

Site events trigger contract clauses. Nobody is watching for them.

A podium waterproofing joint leaks and the crew reseals it as a routine fix. Nobody notices it's the third repair on the same joint, which under a typical EPC GCC (NTPC's Cl. 27.8, for example) lets the client deduct the cost directly.

The barbending supervisor flags it in the BBS group: the client's nominated subcontractor still hasn't cleared the yard. One message among seven WhatsApp groups, and it never reaches the hindrance register.

Miss the trigger, and the money comes off the bill — or stays held in retention.

  1. Event on site
  2. Clause triggered
  3. Noticed too late
  4. Money lost
+12 monthsOf liability per repair, with retention held until it ends.
1 weekTo get the hindrance logged and formally reported.
Pay

Every load arrives as a photo. The vendor’s bill arrives as one total.

Every load of material arrives as a photo of a challan or weighbridge slip. By month-end, nobody has totalled what each vendor delivered, so each vendor’s bill is checked against a pile of photos.

The material was used. Nobody can say what each vendor is owed.

  1. Delivery on site
  2. Challan photo
  3. Totalled by vendor
  4. Vendor bill checked
130Deliveries in three weeks on one contract, all as photos in WhatsApp groups.
Across projects
5 → 25What a regional head runs: 5 sites, 25 WhatsApp groups. None of them reached him directly.

On one project, he heard the site had been blocked from a phone call, after the client review. On another, the team rebuilds the month's work done from WhatsApp chat before every bill.

The commercial picture reaches head office after the bill has gone.

Because the commercial impact of what happens on site should be clear the same day — not pieced together by hand, and never a surprise.

Who this is for

Built for whoever answers for the money on your projects.

Billing heads, contracts and claims heads, and the MDs and CFOs they report to. Every bill and every claim depends on what happened on site, but it reaches you at month-end, after the bill has gone and the notice window has closed.

Billing heads

You turn the month’s work done into the RA bill, then chase it through certification.

  • Work done reaches you through calls and DPRs, and some of it misses the bill
  • Bills come back for a missing cube result, level survey or checklist

This month’s work done per BOQ line, with the test results, checklists and photos behind each line, and WhatsApp follow-ups for the ones your team marks due before the bill goes.

Contracts & claims heads

You protect what the company is owed: EOT, change of scope and claims, on records kept at the time.

  • A hindrance mentioned once in a site group never reaches the hindrance register
  • Notice windows close while an issue is still being sorted out verbally

Hindrances, instructions and change of scope matched to your contract the same day, with the notice deadline, reminders, and the posts and photos that record it. In early access.

MDs, CFOs & commercial heads

You answer for working capital and margin across every project, but see each one through its PM, days late.

  • Uncertified work builds up project by project, out of sight until month-end
  • Vendor bills arrive as totals, with the deliveries behind them scattered across groups

One daily pulse across projects, and a dashboard of pending checklists, potential entitlements and risks, with each project’s bill quantities and deliveries by vendor behind it.

Site & project teams

They keep posting in the WhatsApp groups they already use. Nothing to install, no new forms.

  • A new app means another login nobody opens after week two
  • Every head-office request is another call to the site

Velora reads their groups, reminds them on WhatsApp about what your team marks due, and drafts their daily and monthly reports.

Also for specialty and trade contractors billing many sites on one scope, and for PMCs reporting to their clients.

What Velora does

One site record. Every bill, claim and load.

Velora reads every site update against your BOQ and main contract, flags what needs action to whoever owns it, and rolls every project into one commercial view. Your team reviews and decides.

BillBilling & certification

Every bill line goes in with what the client needs to certify it: quality checklists, level surveys, lab results and photos.

Less chasing: Velora collects them and chases on WhatsApp the ones your team marks due.

Bill 14 · This monthFlagged for review
RCC — 210 cum executed of 210 scopedMatches scope
Shuttering — 18 photos matchedFiled for review
Reinforcement — 4.2t captured this weekIn this month's bill
Electrical — 14 DB panels, test reports matchedMatches scope
Work done ready for this month's bill
Explore Billing & certification
ClaimClaims & contractsEarly access

Hindrances, instructions and change of scope matched to your main contract: EOT and rectification notices, deadlines and LD exposure, flagged as site updates trigger them.

Each flag comes with the likely clause, the deadline and the proof to raise it on time.

Entitlement Tracker1 deadline approaching
EOT notice of claim — FIDIC 2017 Sub-Cl. 20.2.1Due in 3d
Delay — CPWD GCC 2023 Cl. 2, LD up to 1%/month, cap 10%Flagged
Design query — clarified, no impactLogged
Notice to rectify — patch repairs, Ch 112, clock runningDay 2
Notices and delays tracked against the contract, clause by clause
Explore Claims & contracts
PaySite record

Every load and litre on record: deliveries by vendor with their challans, and diesel by machine, to check vendor bills against.

The same daily record of progress, hindrances and manpower is what your bills, claims and reports are built from.

Deliveries & fuel · October1 qty not stated
20 mm aggregate · Shakti Aggregates, 14 loads, 412.6 tSlips kept
Bitumen emulsion · Ganga Bitumen, 2.0 tInvoice
10 mm aggregate · one load, no slipQty not stated
JCB 0420 · diesel, 412 L at 4.8 L/hr5 fills
Deliveries by vendor, ready to check against each vendor's bill
Explore Site record
Across projectsMulti-project view

Every project rolls up into one daily pulse for head office, ranked by what needs your attention: focus today, follow up, and watch.

Behind it, a live dashboard across projects: pending checklists, potential entitlements, risks and site health.

Portfolio Pulse · Today2 to focus on
Road package 3 · level survey missing on 2 stretches in this billFocus
Tower B · EOT notice of claim due in 3 daysFocus
Warehouse · 6 QC checklists pending from siteFollow up
Pipeline phase 2 · 2 delays flagged, LD 0.5%/week at stakeWatch
Rolled up from 12 sites, with the live dashboard behind it
Explore Multi-project view

A record you can defend: every update traces back to the WhatsApp message and site photo it came from.

Before and after

What changes, starting week one.

Your teams still run their sites. What goes away is the manual assembly, the relay up the chain, and the version that's already stale — or already missed — by the time it reaches you.

Bill

Work done billed this month, not next.

Executed quantities checked against scope by hand, if at all, so finished work slips off the bill

Work done matched to scope as it happens, and WhatsApp follow-ups for the documents your team marks due until they're in

Proof for the bill buried in a thread with four hundred other messages

Quality checklists, level surveys, lab results and photos filed against the bill line they support

Claim

Notice windows and LD exposure, seen in time.

A hindrance mentioned once in a site group, and the notice window closes unnoticed

Site events matched to the clause they may trigger, flagged with the deadline for your team to review

Small delays nobody totals, until liquidated damages land on the final account

Each delay flagged with the LD rate and cap from your contract, so you see what’s at stake

Pay

Every load and litre accounted for.

Deliveries and fuel posted as challan photos and daily totals that nobody adds up

Deliveries by vendor and fuel by vehicle collated with their photos, ready to check against each vendor’s bill

Across projects

The commercial picture, daily, not at month-end.

Each project’s picture reaches head office through its PM, in its own format, days late

One daily pulse across every project, ranked by what needs your attention, with the dashboard behind it

Uncertified work done is working capital the business is carrying. “We are witnessing delays in certification of the work done and release of payments in projects. This has led to increase in uncertified work done, leading to jump in working capital requirement.” Afcons Infrastructure, Q2 FY27 earnings call, November 2026.

What we keep hearing

The more sites you run, the worse this gets.​

Quantities missed. Bills come up short.

A lot of our setup work isn't in the BOQ at all — we have to track it separately just to know what it cost us. And across chainages, teams sometimes miss reporting quantities entirely, so the BOQ ends up underbilled.
GM ProjectsGovernment Infra O&M Contractor

200 projects. Leadership flying blind.

We're running 200 projects. Leadership needs to see what's happening on the ground to make decisions — right now, that visibility just isn't there.
Contractor200+ Projects Portfolio

Piloted PM app earlier. Abandoned in 2 weeks.

We deployed a mobile app to track 5 infra projects. No one on the field used them. Everyone was back on WhatsApp within 2 weeks.
Project Management Consultant (PMC)Government Infra Projects

How it works

Set up with your team. Then it runs on every site.

Give Velora your WhatsApp groups, your BOQ, work order or billing break-up and your contract, once. Bills, claims and deliveries all work from that same site record, whether you connect one site or twenty.

Here's what Velora does:

01
Read

Captures every update, across every source

WhatsApp messages, voice notes and photos as they happen, in any language, plus the quantities and clauses in your scope and contract. No new app for anyone.

02
File

Every update read and filed, for your team to review

Progress, quantities, test results, hindrances and deliveries, each tied to the chainage or location, BOQ item or clause it belongs to. That's the part a general-purpose WhatsApp bot can't do.

03
Check

Checked against what matters commercially

Against your BOQ and contract: what's ready to bill, what's held for proof, what may be a claim.

04
Flag

Flagged to the right person, before it's too late

Bill lines substantiated, hindrances, change of scope and notice deadlines flagged, and reports drafted, each to whoever owns it.

Data Sources

DPR Group
Manpower Group
Package Groups
Scope
Contracts

Involved Parties

GC & EPCInfra & UtilitiesSpecialty TradesPMCs
Velora

Velora AI

Read
File
Check
Flag

What You Get

Work done matched to the BOQ
Every bill line with its proof
Hindrances and notices flagged
Deliveries recorded by vendor
Reports drafted, ready to review
Every project in one daily pulse

We start with a three-month pilot, working closely with your team

On your live sites, at a heavily discounted pilot rate and with no long-term commitment.

  • Onboarded with your team

    We connect your groups, scope and contract alongside your team, and take your site and commercial teams through what they'll see.

  • Tuned to how your teams work

    We set Velora up around your practices: how your sites name locations, the units and shorthand they use, and what your team wants flagged.

  • Refined on your feedback

    We gather your team's feedback throughout the pilot and refine what Velora files and flags around it.

Pricing

Runs on your existing WhatsApp, with nothing for your site team to install.

One plan, everything included — priced per project.

Billing & certification
  • Work done, captured from site
  • Matched to the BOQ
  • Every bill line with its proof
Claims & contracts
  • Hindrances and change of scope flagged, with clause
  • Notice deadlines, with reminders
  • Routed to whoever owns it
Site record
  • Deliveries by vendor, diesel by machine
  • Progress and hindrances, by chainage or location
  • Report drafts, ready to review
Multi-project view
  • Every project in one view
  • A daily pulse for head office
  • Live dashboard across every project
And Velora does the chasing.Follows up on WhatsApp about open commitments, blockers and the documents your team marks due, and reminds before anything slips.
Custom pricing, per project

No per-user charges · discounted pilot rate, limited spots · no long-term commitment · hands-on onboarding and support, with direct access to our founder

Onboarding Add-on

Starting Velora on a site already underway?

Historical Data Migration brings in the site's past WhatsApp chats, so the record covers its history, not just what happens after go-live.

Ask About Migration →
Free

Looking just for progress-report drafts?

The free DPR Generator drafts daily progress reports from your WhatsApp group chats. No subscription.

→ Learn more about the DPR Generator

See it on your own sites.

Request a pilot and we'll set it up on your live sites and existing WhatsApp groups.

Frequently Asked Questions

Common questions from teams who've seen PM tools fail before.

Every bill and every claim depends on what happened on site, but it usually reaches you at month-end, after the bill has gone and the notice window has closed. Velora connects what happens on site to your BOQ and your main contract, so work done reaches this month's RA bill with the documents the client needs to certify it, hindrances and change of scope reach your contracts team while the notice window is still open, and every delivery is on record by vendor to check their bills against. MDs and CFOs see the hindrances, scope overruns, pending checklists and potential claims across every project in one daily pulse and dashboard.

No. Velora works alongside them. It reads the WhatsApp updates your site teams already send and turns them into bill quantities with their proof, contract alerts and the site record; your ERP (SAP or otherwise), PM suite or Excel trackers stay the system of record.

Billing & certification, the site record and the multi-project view are live. Claims & contracts is in early access, available as a pilot on your sites.

No. Your site teams keep using WhatsApp & documents exactly as they do today. Velora reads what they already post across every group and document — no new apps, no forms, no training. It also works in the language your teams are most comfortable in: English, Hindi, Telugu, Spanish, Arabic and more.

Velora connects to your groups through an existing WhatsApp number — one number or multiple. We recommend getting separate site-specific numbers though for privacy & enhanced functionality. Velora reads every message for progress, issues, commitments, inspections and deliveries. Nothing changes for your site teams.

All of it, as one product. Billing & certification captures work done, matches it to your BOQ and substantiates each bill line with quality checklists, level surveys, lab results and site photos. Claims & contracts (early access) flags hindrances, instructions and change of scope that may trigger a clause, with EOT and rectification notice deadlines and LD exposure on your main contract. The site record covers progress, hindrances, manpower, deliveries by vendor, material and fuel consumption, and reports: what the others are built from. The portfolio view rolls all of it up across your projects into one daily pulse and a live dashboard.

It all reads from the same WhatsApp groups and documents your team already uses — you don't set up separate sources for each part.

Velora tracks which quality checklists, RFIs and level surveys are still open for each work front, and sends a daily digest reminder in WhatsApp to whoever owns them, throughout the month. When a test is reported on site, its lab result is followed up too. Anything not closed carries forward to the next reminder instead of getting dropped.

Nothing sits on someone's to-do list waiting to be remembered — the follow-up happens in the same group they already work in.

Every checklist, level survey, lab result and site photo your team shares in WhatsApp is filed against the bill line it likely belongs to, the same day it's shared, for your billing engineer to confirm.

By the time the monthly bill goes out, each line already has its supporting documents behind it — not buried in a thread with four hundred other messages and reconstructed from memory.

Velora watches your WhatsApp groups for site events that can trigger a contract clause — a materials hold-up, restricted site access, a verbal instruction, a third repair on the same joint, a client's notice to rectify — and matches them against your contract's clauses and its LD rate and cap, for your team to confirm.

A single delay rarely looks worth escalating on its own. Velora flags each one with the LD at stake, and reminds your team when a notice window is about to close — before the deadline passes, not at the final account. A running total across delays is something the team is still working on.

Velora is built for infrastructure and EPC contractors paid on measured work against a BOQ, work order or billing break-up, whose site teams report on WhatsApp. Within those firms, it's for the commercial desks: billing heads, contracts and claims heads, and the MDs and CFOs they report to. It covers road construction and maintenance, rail and metro, transmission lines, water and pipelines, and industrial and building EPC, as well as specialty and trade contractors proving their own scope and PMCs running sites for a client. If your sites run on WhatsApp groups and your bills are raised against measured quantities, Velora is for you.

Both. Every site is structured the same way — work fronts, progress, blockers, commitments, inspections, deliveries, billing evidence, entitlement — so whether you're running one site or fifteen, they all report into the same format.

You see each site on its own, and you can scan across all of them without a call to every PM. The manual work of compiling and comparing is what goes away as you add sites — not the PM on each site.

PM tools ask site teams to change how they work. Site teams go back to WhatsApp within weeks because it's faster and already on every phone. Velora works on top of WhatsApp — not instead of it. Site teams change nothing. Site control builds itself from what they're already saying.

See how Velora compares to Procore, Buildertrend, Fieldwire, and task apps →

No. One plan covers all of it — billing and certification, claims and contracts, the site record and the multi-project view — priced per project. There are no per-user charges, so you can add as many users as you need.

We run a heavily discounted pilot for the first three months — full product, no long-term commitment. We onboard your teams, tune Velora to how they work and refine it on their feedback, so you see what it surfaces on your own sites before committing to a subscription.

It starts with a short onboarding call to make sure Velora fits how your site runs. From there, we work with your team to align on and upload your site's work front structure, connect your WhatsApp groups, and set up contact roles — then you're live. Your site teams change nothing about how they work.

Yes. Data is stored securely with role based access control, and privacy data is encrypted at rest using AES-256 standard.